Proposed 21.45 has. Phase 1 and 13.35 has Phase 2 Whistler Village Property in Brgy Marinig, Cabuyao, Laguna
Master Plan / Feasibility Study
Flood Control and River Improvement of San Cristobal River in Laguna and Calbiga River in Western Samar
Feasibility Study / Detailed Engineering Design
Malabang River Basin Flood and Sediment Control Project
Consulting Services
Barangay Cabangahan, Cantilan, Surigao Del Sur (Phase 1 & 2)
Topographic Survey for Taytay Resettlement Site for Consulting Services for the Construction Supervision of the Pasig-Marikina River Channel Improvement Project, Phase IV (PMRCIP IV)
Hydrological & Hydraulic Study
Burgos et. Al Properties and Covering area of 12.2586 hectares located at Butuan City. Agusan del Norte
Feasibility Study and Detailed Engineering Design
Feasibility Study and Detailed Engineering Design for the Proposed Camiling-Agno River Floodway (Re-Bidding)
Master Plan and Feasibility Study
Master Plan and Feasibility Study of Flood Control and River Improvement of Chico River in Cagayan
Consulting Services
Development of Groundwater Management Plan (GMP) for Baguio, Batangas City, Masbate City
Consulting Services
Development of Groundwater Management Plan (GMP) for Cavite
Detailed Engineering Design
Detailed Engineering of Libang River Irrigation Project
Consulting Services
Water Resources Assessment for River Basins: Agno, Bicol, Cagayan, Ilog-Hilabangan, Jalalur, and Tagoloan